AproximaciÓn de curvas "s" para la planeaciÓn de proyectos de construccion mediante modelos logÍsticos

Research output: Contribution to journalReview articlepeer-review

1 Scopus citations

Abstract

One of the most used tools for project control is the Earned Value Management (EVM) method. Establishing the planned value curve (PV), as the baseline of periodic investments in relation to which progress in construction projects is controlled, it is very common to define this curve intuitively; what causes in many occasions that the contractors fall in breaches during the phase of execution. This research suggests that the progress in construction projects follows typical trends related to the nature of the projects, which can be transformed into a standard S curve, elaborated from mathematical models, increasing the probabilities of success of a project, in contrast to if an intuitively developed S curve is used. From a sample of potable water, sewerage and roads projects, whose construction had already been completed, logistic models were developed for project planning in those sectors, based on the estimated budget and deadline for their execution. Subsequently, the models obtained were applied to projects in execution, showing differences between the planned progress curves with respect to the curve of the proposed model.

Original languageSpanish
Pages (from-to)354-373
Number of pages20
JournalInvestigacion Operacional
Volume42
Issue number3
StatePublished - 2021

Bibliographical note

Publisher Copyright:
© 2021 Universidad de La Habana. All rights reserved.

Cite this