T1 - AproximaciÓn de curvas "s" para la planeaciÓn de proyectos de construccion mediante modelos logÍsticos
AU - Merizalde, Juan
AU - Carrera, Fernando Castro
AU - Castro, Patricio
AU - Osorio, Juan C.
N1 - Publisher Copyright:
© 2021 Universidad de La Habana. All rights reserved.
PY - 2021
Y1 - 2021
N2 - One of the most used tools for project control is the Earned Value Management (EVM) method. Establishing the planned value curve (PV), as the baseline of periodic investments in relation to which progress in construction projects is controlled, it is very common to define this curve intuitively; what causes in many occasions that the contractors fall in breaches during the phase of execution. This research suggests that the progress in construction projects follows typical trends related to the nature of the projects, which can be transformed into a standard S curve, elaborated from mathematical models, increasing the probabilities of success of a project, in contrast to if an intuitively developed S curve is used. From a sample of potable water, sewerage and roads projects, whose construction had already been completed, logistic models were developed for project planning in those sectors, based on the estimated budget and deadline for their execution. Subsequently, the models obtained were applied to projects in execution, showing differences between the planned progress curves with respect to the curve of the proposed model.
AB - One of the most used tools for project control is the Earned Value Management (EVM) method. Establishing the planned value curve (PV), as the baseline of periodic investments in relation to which progress in construction projects is controlled, it is very common to define this curve intuitively; what causes in many occasions that the contractors fall in breaches during the phase of execution. This research suggests that the progress in construction projects follows typical trends related to the nature of the projects, which can be transformed into a standard S curve, elaborated from mathematical models, increasing the probabilities of success of a project, in contrast to if an intuitively developed S curve is used. From a sample of potable water, sewerage and roads projects, whose construction had already been completed, logistic models were developed for project planning in those sectors, based on the estimated budget and deadline for their execution. Subsequently, the models obtained were applied to projects in execution, showing differences between the planned progress curves with respect to the curve of the proposed model.
KW - Construction project control
KW - EVM
KW - Earned value management
KW - Planning
UR - https://www.scopus.com/pages/publications/85106471032
M3 - Crítica
AN - SCOPUS:85106471032
SN - 0257-4306
VL - 42
SP - 354
EP - 373
JO - Investigacion Operacional
JF - Investigacion Operacional
IS - 3
ER -